Monday, September 16, 2013

By 31 December, the CSN submit to the European Commission ore ida easy fries this report, translate


The Plenary of the Nuclear ore ida easy fries Safety Council (CSN) has approved the final report of the resistance tests that have undergone espaolas nuclear ore ida easy fries plants, according to the timetable set out in the European Union. The CSN has reviewed the final reports submitted by operators within the process of European stress tests ("stress-tests"), including the realization of a specific program of 24 inspections.
By 31 December, the CSN submit to the European Commission ore ida easy fries this report, translated into English as proceeding with the preliminary report last September. ore ida easy fries This text is the result of the work of more than six months, during which 14 EU countries with nuclear reactors have evaluated the degree of resistance of its facilities after the accident in Fukushima (Japan). Key Findings
The reports submitted by the operators meet the specifications of the stress tests developed by WENRA / ENSREG and give an appropriate response to the specific Instructions ore ida easy fries Complementary Techniques (ITC) issued by the agency.
The findings and studies show the existence of margins that ensure the maintenance of the security ore ida easy fries of power beyond the assumptions considered in the design. Additionally, to increase responsiveness ANMS extreme situations, the owners propose relevant improvements implantation and strengthening the resources to deal with emergencies.
Realizarn improvements are identified in several stages, in function of their technical characteristics and the time needed for implantation. ore ida easy fries The planned time schedule is as follows:
Long term, to complete the entire ore ida easy fries program of improvements, including new developments and design changes involving new construction or changes to existing systems. Finalizacin provided between 2015 and 2016.
The CSN evaluation has identified actions and studies to ensure that all aspects ore ida easy fries are adequately addressed and that the proposed actions ore ida easy fries are effective. The issue instructions CSN Complementary Techniques (ITC) to each holder in early 2012, which will require the implantation of the improvement proposals submitted, as well as carrying out additional ore ida easy fries studies or other modifications necesariasEntre the CSN considers the proposed improvements include:
Faced with the loss of electric power and heat sink: The Bern establish measures and actions to maintain a continuous electrical current controls and instrumentation, it must have port equipment tiles as well as improvements that can recover from central case Power hidrulicas outside nearby.
As to the emergency organization: It will construct alternative Gestin new centers in each emergency ore ida easy fries center, adverse supporting accidental situations, and create a common center emergency support, ore ida easy fries with human and materials available to intervene in any office in a maximum period of 24 hours.
In severe accidents: ore ida easy fries The CSN considers that all holders have the contencin filtered venting as hydrogen recombinators as in areas that may be at risk of accumulation of the same. They also require the installation of various ore ida easy fries methods ore ida easy fries that allow injecting water in both the reactor vessel and in the steam generators or contencin.
As for the fuel storage: Background and Council workflow holders require the availability of alternative means fixed and laptops to supply water to the spent fuel pool, as well as improvements in measurement instrumentation level and temperature of the water. Background and work process
The report presented today by the Nuclear Safety Council is the result of independent analysis and detailed reports previously ore ida easy fries made by the owners of the plant, and is part of a Europe-wide plan homogneo to analyze ore ida easy fries current capacity each site to withstand accidents beyond their bases diseoe implement improvements deemed necessary. As, the plants have revised their resistance to the following events:
All European regulators presentarn ore ida easy fries a report like this before December 31, 2011. Subsequently, between January and April 2012, the whole process ore ida easy fries again be subjected to revision between all regulators ore ida easy fries (peer review). This revision was published in seminars and discuss national and international character to allow the participation of all stakeholders.
In Spain, in addition, the CSN has issued, the middle of this year,